OFR LDI Bid Generator

Ortego Fortified Roofing · A Division of Ortego Enterprises LLC · Belle Chasse, Louisiana
Ortego Fortified Roofing logo

Import Roofr Report

Reads the Roofr Report summary client-side and fills owner, address, area, pitch, edges, flashing, and accessory measurements.

⚡ Auto Calculator (Mode B) — Enter Measures Data

Punch in the raw job data from your Roofr Measures report. Click Calculate & Fill Below and the tool auto-populates every LDI subtotal using Jared's labor rates + SRS-verified material pricing + your overhead/GP settings. Edit any per-unit cost below to override defaults per job.

Entry systems use a fixed bundled sell price. Hip/ridge is converted to equivalent squares and included in that price. Eave/rake drip edge is included and never charged separately. Only genuine accessories and job conditions add to the system total.

⚠️ ICE & WATER REQUIREMENT: Ice & Water Shield (peel & stick) is REQUIRED on the entire roof deck on every FORTIFIED roof — UNLESS the attic is spray foamed. For spray-foam roofs, check Spray Foam System below to replace full-deck peel & stick with two layers of ASTM D8257 synthetic underlayment.
GAF
CertainTeed
Atlas
Choose the full system. GAF Good, CertainTeed Better, and Atlas Good are the bundled entry systems.
Unit Cost Defaults (edit per job if needed)
📐 Area & Shingle System
📏 Edge / Flashing $/LF
🕳️ Penetrations & Vents $/EA
🔨 Deck, Labor & Job Settings

Labor allocation split (from Jared's Sep 17 approval): Tear-Off 15% · Roof Covering 40% · SRD 15% · Deck Attach 10% · Flashing 12% · Vents 8% = 100% of base $/sq.

Enter in Roofr order. Eaves + Rakes drive drip edge cost (highlighted — folds into Row 7).

Sales team: add any custom items with a description + cash price. Sums into LDI Row 12 (Misc) alongside the permit fee. Perfect for negotiation flex, one-off requests, or cash-priced add-ons the standard tool doesn't cover.

Enter the # of SQUARES affected by each condition. Not all squares may need every surcharge (e.g. only 8 sq at steep pitch on a 24 sq roof). Each square × doubled labor rate = added labor cost. Deltas apply to Row 4-8 (roof labor allocation). Marked up at your OH + GP + commission.

+$0/labor
+$0/labor
+$0/labor
+$0/labor
+$0/labor
+$0/labor

💰 Optional Upgrades — Present to Homeowner

After base calculation, check any upgrades the homeowner selects. Each upgrade delta is calculated at your 30% GP target. Total bid = Base + Selected Upgrades. Perfect for the "here's what you get, here are your options" sales flow.

⚠️ FORTIFIED COMPLIANCE REMINDER: If the home has gable vents, Gable Vent Protection is NOT optional — it's a FORTIFIED Roof Certificate requirement. Failure to install disqualifies the home for FORTIFIED designation and blocks LFHP grant reimbursement. Always check this box for homes with gable vents.
BASE BID: Calculate the base first (above) to see upgrade deltas here.
🛡️ Class 4 Impact Rating Upgrade — Insurance Discount (5-25%)

Pick ONE impact-rated shingle to match your homeowner's brand preference. All UL 2218 Class 4 — unlocks 5-25% homeowner insurance premium discount for life of roof. ROI 3-7 years on the material upcharge.

🏆 Extended Manufacturer Warranty Package — Brand-Matched SRD

Upgrades the base 2-layer synthetic to a brand-matched name-brand ice & water underlayment. Required to register the homeowner for the shingle manufacturer's extended warranty program. Auto-adjusts based on the shingle system selected at the top.

➕ Add-On Protection

Full Deck and Supplemental SRD are mutually exclusive. Pick one: full-deck ice & water shield (whole roof) OR supplemental SRD (critical points only). If Full Deck is selected, Supplemental is not shown to homeowner.

🛠️ Extended Workmanship Warranty (Sales Team Can Toggle Free)

Base bid includes 1-yr OFR workmanship warranty. Extend it below. Only the 3-year warranty can be given free as a sales closing incentive — 5-yr and 10-yr are always paid.

Job Info

These fields build the salesperson signature card on Page 16.

Woodwork — Tear-Off & Structure

RQD
Item
UM
Qty (#)
Subtotal ($)
✓
Roof Structure RepairRotted deck, damaged truss/rafter, soffits, fascia
✓
Tear Off & Disposal FeeRemove & dispose old roof covering
Roof Sheathing ReplacementNew sheathing (only if adding, not just repair)

Roof Covering — FORTIFIED Standards

✓
Roof CoveringClass F or H asphalt shingles
✓
Sealed Roof Deck (SRD)Peel & stick membrane (ASTM D1970)
✓
Roof Deck Attachment8d ring-shank nails @ 4" OC
✓
Roof FlashingWall, valley, boots, drip edge, vent stacks
✓
Ridge and Off-Ridge VentsTAS 100(A) compliant
SkylightsImpact requirements per Ch. 7 of 2025 FORTIFIED Standard
Accessory Structure — Low-Slope RoofPorches / add-ons under 2:12 pitch
Gable Wall VentsRemovable plywood / non-porous shutters

Miscellaneous

✓
Permit Cost & Engineering FeesParish permits, engineer letters, filing fees
Hip and Ridge TilesCement / clay accessory pieces on top of shingles

Tax

Sales TaxLouisiana + parish tax (if not baked into line items)
Total Bid
$0.00
Total Per Square
—
Show JSON payload preview
(fill form to see payload)

📁 Bid Log — Recent Finalized Bids

Every time you click Copy Payload, the bid is saved here on this device. Click Re-Copy to copy that payload back to the clipboard and upload to LDI. Stored locally in the browser (last 50 bids).

No bids logged yet. Complete a bid and click "Copy Payload" to log it here.

🔖 Bookmarklet Setup (one-time)

Drag this button to your Chrome bookmarks bar. Then click it whenever you're on the LDI portal bid sheet page after copying a payload from here.

📌 OFR Fill

Right-click the button above and select "Bookmark this link" if drag doesn't work.

Show raw bookmarklet code (for advanced users)